Solutions

For Manufacturers

Reducing manufacturing risk by validating systems before they are built.

Applicable to both factory planning teams and machine builders working within complex production systems.

Our Approach

APEXIZ applies early system validation at both the factory and machine level.

We help teams test assumptions, evaluate system behavior, and align decisions early. This reduces costly changes during integration and commissioning.

Manufacturing contexts

Manufacturing challenges vary significantly depending on where decisions are made.

Factory planning teams deal with layout, flow, capacity, and coordination across multiple systems. Machine builders, on the other hand, are responsible for proving how individual machines perform and integrate within larger production environments.

Although the contexts differ, both demand early validation to prevent late-stage rework, delays, and commissioning surprises.

Factory Planning

Planning Risk in Traditional Factory Design

Factory planning decisions are often locked in before the system is ever tested as a whole. Layouts, flows, and capacity assumptions are validated using drawings and spreadsheets—tools that cannot reveal real system behavior.

As a result, critical interactions between machines, material flow, and sequencing remain hidden until installation or commissioning, when changes are costly and disruptive.

Typical outcomes:

  • Layout and flow decisions based on static representations
  • Capacity assumptions validated in isolation
  • Limited visibility into system-level behavior before build
  • Bottlenecks and integration issues discovered late

Planning Scenarios We Support

New Line or Greenfield Setup

Early validation of layout, flow, and capacity before physical decisions are locked

Expansion or Process Change

Assessing system-level impact when adding stations or modifying processes.

Commissioning Risk Reduction

Identifying and mitigating risks before installation or commissioning begins.

Start a conversation Go to Machine OEMs →
Machine OEMs

Early Validation Challenges for Machine OEMs

Machine OEMs are no longer evaluated only on individual machine performance. Customers increasingly expect early system-level clarity—layout fit, cycle time, integration points, and overall behavior—often before a purchase decision.

However, early validation typically relies on drawings, videos, or past references. This leaves system behavior assumed rather than proven, pushing critical questions into integration or commissioning—when changes are costly.

Common challenges:

  • Limited ability to demonstrate machine behavior within a full production system during pre-sales
  • Cycle time, sequencing, and interaction assumptions left untested
  • High scrutiny on performance and scalability without system-level evidence
  • Repeated clarification across similar projects and customers
  • Integration risks and scope gaps discovered late

How OEMs Apply Early System Validation

Simulation-Ready Machine Models

Machines prepared for realistic system layouts, enabling early evaluation of footprint, performance, and integration.

Reusable Digital Libraries

Standardized machine and component models reused across projects to reduce engineering effort and improve consistency.

Demo Cells and Reference Systems

Representative system setups that demonstrate machine behavior in a broader production context—without physical builds or site visits.

Start a conversation Go to Factory Planning →